S&P INFRA group was incorporated in 2000 with a vision of efficient and sustainable infrastructure development. Headquartered in New Delhi, it is one of the fastest growing infrastructure development groups in India with a significant presence in building and construction, repair and maintenance, and other civil infrastructure works in India.

S&P INFRA group is built on core values of integrity, reliability, innovation, and commitment, which reflect in the success of several key projects undertaken by the company in a span of 14 years. We thrive on our balanced mix of engineering expertise, technical innovation, and meticulous project management, which allows us to harness maximum utility of our human capital and material resources. Cross-stream feedback mechanism used within our organization provides an industry-leading framework for efficiently managing diverse projects, in various geographic regions, which has resulted in minimization of risks or redundancies.

Groups excellent track record in the industry and its incessant efforts towards perfection has enabled it to undertake various multi-disciplinary projects on EPC basis and currently aims to achieve high growth corridor highway projects on build, operate, and transfer (BOT) basis, and under the new category of Operate, maintain, and transfer (OMT) of highway Toll projects. We at S&P INFRA strongly believe in holistic contributions to our society, which positively impact our communities on a micro-level. We create sustainable civil infrastructure in local communities, while providing equal local employment opportunities.

We also take pride in our outstanding project life cycle management, which is exemplary of maintaining quality while meeting end-goal targets within predefined time lines, something that is rarity in the Indian infrastructure sector.

S&P INFRA maintains an inventory of modern and specialized equipment mobilized around the country for many key projects. We have successfully completed 28 road and highway projects, and have 21 running projects at various locations in India. Company’s portfolio is magnifying with strategy and planning for exponential growth through diversification and assertive approach towards large quantum projects in the years to come. Company's portfolio of works is expanding through its interest in 9 new projects that have been bid in the last 1 quarters of 2014, creating a strong future order book and an exponential growth potential in the years to come.

Vision

We aspire to set an example of our craftsmanship in the field of infrastructure development in India through our consistent performance and engineering innovation in the demanding conditions of this industry. On this journey of rapid growth we measure our success by the difference we create in lives of the local communities that use flyovers, roads, tunnels, airports, and other world-class infrastructure developed by us. While maintaining international standards we care to remain sensitive to the environment we build in and our goals are rendered to minimize the impacts on our surroundings.
At S&P Infra we deliver the best quality work in roads and highway projects, with maintenance. Our mission is to develop sustainable civil infrastructure through our specialized project management and efficient construction processes across deferent geography. With an ever-expanding base and work horizon we are on the path to become a pan-India group by 2016.



Regards,
Krishna Pandey
CMD




Leadership

  • Krishna Pandey (Managing Director)
  • Rohtash Singh (Director – Human Resource)
  • Sanjeev Gaur (Director – Operations & Procurement)









Our Expertise

Business Areas: Roads and Highways

We provide Engineering, Procurement, and Construction services for medium to large-scale roads and highway projects

Services

S&P Infra provides EPC services as a single point responsibility on a Lump Sump Turnkey basis for the infrastructure projects:

  • Transport and logistics for equipment
  • Design, testing and execution
  • Operation and maintenance contracts long term & short term
  • Training of manpower
  • On site mechanical maintenance contracts for equipment
  • Repair and refurbishment works for existing roads & highways
  • Complete renewal, patchwork and equipment asset management

Engineering

We have strong engineering capability and resources using which we offer an agile and flexible approach for different project needs, technologies, and unique local requirements.

Procurement

We maintain a global network alliance for sourcing material, which enables us to get the competitive costs at the best available quality and range. Our centralized control system enables the project teams to undertake effective and flexible construction scheduling.

Construction

Our enhanced construction techniques enable the project teams to take on complex projects. We are among the few companies who can lay and execute highway projects within stipulated time in states like UP and Bihar.

Equipment

Equipment management renders a strategic advantage which serves as key factor for timely completion of all our projects across the country due to ease of equipment mobilization. Our various project sites house these equipments. At S&P Infra we minimize downtime by using highly skilled operators and maintenance crew to use preventive and condition-based maintenance at our sites. Our skill set includes equipment asset planning and resource management for inventory maintenance.

  • Asphalt Plant (Hot Mix Plant)
  • RM Concrete Mixer Plant
  • Porcelain Machine
  • Excavators Machine (JCB)
  • Pavers Machine
  • Vibrator Roller
  • Soil Compactors
  • Dumpers (HYWA)
  • Tandom Rollers
  • Water Tankers
  • Generator Sets
  • Wheel Loader
  • Transit Mixers
  • Truck Mounted Sprayer (Bichmen Sprayer)
  • Grader (CAT)

Completed Projects

EPC Works
Name of the ProjectEmployer LocationLength (km)Amt(In Crore)
Widening and strengthening in Km. 152.600 to Km. 166.000 and Km. 135.000 to Km. 149.000 of N.H.-28B SUPERINTENDENT OF WORKS, Ty. D.C.U. (N.H.), P.W.D., GorakhpurGorakhpur, Uttar Pradesh28 28.51
Improvement work in Km. 36 to 68 (except in Km. 44.00 to 46.775) of N.H. – 83 (Job No. – LWE– BR – 2010 – 2011 – 171) Executive Engineer, N.H. Division, Gaya, Bihar Gaya, Bihar 22.225 20.94
Widening & Strengthening in Km,. 129.30 ot 143.00 on NH-19 as per agreement no. SBD 46 of 2010-2011 (Job no. 019-BR-2010-828) Executive Engineer, RCD, N.H. Division, Gulzarbagh, Patna, Bihar Chapra to Manjhi, Bihar 13.7 19.2
Strengthening of NH - 37 from Shantipur to Meka (Length 19.50 Km. in runachal Pradesh Package of SARDP-NE Executive Engineer, (NH), PWD, NH Division, Jairampur, Arunachal Pradesh Shantipur, Arunachal Pradesh 19.5 22.7
execution of the LWE Scheme work of widening to 2 lane and improvement of Amba-Nabinagar road from Km. 0.00 to 24.00 Executive Engineer, RCD, Road Division No. 1, Gulzarbagh, Patna Amba nabinagar, Bihar 24 14.99
Widening & Strengthening of existing two lane road (NH-24A) Lucknow Bypass Chief Engineer (NH) UPPWD, Nirman Bhawan MG Road, Lucknow Lucknow, Uttar Pradesh 7 58.35
Widening and Strengthening from Km 0 to 18 on NH-2C Executive Engineer, NH Division, Aurangabad Aurangabad, Bihar 18 11.57
Improvement of existing carriageway on Bhilwara - Rajsmand Section of NH - 758 (Approx Length 36 Kms.) in the state of Rajasthan General Manager (CM-1), National Highway Authority of India, New Delhi Bhilwara, Rajasthan 36 11.3
Construction of Additional (2+2) lanes and one lane for exempted vehicles on either side (upgrading from existing 2+2 lane to 4+4 lane) at Km. 416 (barsoni) of NH-31 and allied works for collection of user fee in respect of Purnea - Dalkhola section from Km. 410.700 to Km. 447.00 of NH 31 in the State of Bihar Project Director, PIU, Siliguri, West Bangal Barsoni, West Bangal 2 9.93
Widening & Strengthening of NH 80 (Bhagalpur to Mirzachowki) from Km. 181 to Km. 190 for the year 2009-10 Executive Engineer, RCD, NH Division, Bhagalpur Bhagalpur, Bihar 9 11.56
Widening & Strengthening of NH 80 (Bhagalpur to Mirzachowki) from Km. to Km. 0 for the year 2011-12 Executive Engineer, RCD, NH Division, Bhagalpur Bhagalpur, Bihar 13 8.68
Rehabilitation of Janak Setu Flyover in West Zone Executive Engineer, west zone, New Delhi Delhi 1.2 6.46
IRQP work in Km. 74 to 93 of NH 80 Talaiya Talao to Ghorghat in the state of Bihar Executive Engineer, NH Division, Lakhisarai, Munger Lakhisarai, Bihar 19 8.44
IRQP work in km . 109 to 121 of NH 82 for the year 2012-13 Executive Engineer, NH Division No. 2, Biharsharif, Bihar Biharsharif, Bihar 12 8.92
Maintenance works
Short Term Improvement and Routine Maintenance of Siliguri – Islampur – Dalkhola – Purnea Section of NH – 31 from Km. 410.700 to Km. 551.000 (Excluding Km. 498.780 to Km. 507.000) During 2013-14 in the State of Bihar and West Bengal Project Director, PIU, National Highways Authority of India, Siliguri, Wet Bengal Siliguri,West Bengal 132 4.88
Maintenance and Renewal Work of Mau to Gorakhpur Section km 110 to km 211.2 of NH 29 In Km 110, 127 200m 128, 129, 136, 138 of 500 139 of 500, 143, 147, 150, 152 to 158, 161 to 167, 170, 172 to 500m,178 and 181 total length 24.95km with patch work in selected locations in the State of U.P. Project Director, PIU, National Highways Authority of India, Gorakhpur Gorakhpur, Uttar Pradesh 25 13.57
Maintenance of Varanasi -Gorakhpur Section of NH-29 from Km. 110.00 to 211.200 in the State of U.P. General Manager (CM) National Highway Authority of India, New Delhi Gorakhpur, Uttar Pradesh 101.2 7.27
Periodical Renewal from Km. 103 to Km. 112 & km. 113.5 to Km. 127.520 of NH-98 in the State of bihar (Job no. 098-BR-2010-1360) Executive Engineer, N.H. Division, RCD, Aurangabad Aurangabad Bihar 23 5.86
Repair of expansion joints and construction of New Bituminous wearing coat in place of damage cement concrete wearing coat over U/S lane of M.G. Setu on NH-19 (Job no. 019-BR-2009-807) Executive Engineer, NH division, Gulzarbagh, Patna Patna, Bihar 1.5 4.61
Short Term Improvement and Routine Maintenance of Handia to Rajatalab section from Km. 245.00 to 317.389 of NH-2 in the State of UP General Manager (CM) National Highway Authority of India, New Delhi Allahabad, Uttar Pradesh 72.39 3.41
Short Term Improvement and Routine Maintenance of Varanasi-Mohania-Sasaram- Dehri-on Sone section from Km. 317.00 to Km. 140.00 on NH-2 in the State of UP and Bihar General Manager (CM) National Highway Authority of India, New Delhi Mohania, Bihar 177 7.27
Ordinary Repair & provide renewal of Rajasmand – Bhilwara – Ladpura NH – 758 in the State of Rajasthan NHAI, Bhilwara Bhilwara, Rajasthan 15 0.81
Ordinary repair and periodical renewal work of Udaipur (NH-8) – Kundal – Naya kheda – Jhadol – Som – Nalwa – Daiya (Gujarat Border) – of NH – 58 Ext. NHAI, Udaipur Udaipur, Rajasthan 22 1.44
Short Term improvement & routine maintenance of Gorhar barwa Adda Section from km. 320.00 to 398.750 on NH 2 in the State of Jharkhand GM (CM - 1) NHAI, New Delhi Barwa Adda , Jharkahnd 7.25 10.63
Short Term improvement & routine maintenance of Aurangabad to Gorhar Section from km. 180.00 to 320.000 on NH 2 in the State of Jharkhand GM (CM - 1) NHAI, New Delhi Gorhar , Jharkahnd 140 5.45
Short term improvement and routine maintenance of Kanpur – Fatehpur section from Km. 457.377 to Km. 508.877 and from Fatehpur – Thariyan section (Package – II) from Km. 508.877 to Km. 571.197 on NH – 2 GM (CM - 1) NHAI, New Delhi Kanpur, Uttar Pradesh 114.5 11.19

Ongoing Projects

Name of the Project Employer Location Amount (in Crore) Length (in Kms)
Widening & Strengthening of Kuru - Lohardaga - Ghagra road from K. 0.0 to 44.00 for the year 2012-13 Executive Engineer, Road Construction Department, Latehar Lohardaga, Jharkhand 53.53 44
Construction of Latehar saryu kotam (Garu) road (MDR 249) from Km. 0.00 to 32.00 in the state of jharkhand Executive Engineer, Road Construction Department, Latehar Latehar, Jharkhand 53.13 32
Widening & Strengthening work of Basti – Mahson – Mahuli from Km. 1.800 to Km. 27.000 in the State of Uttar Pradesh Superintending Engineer PWD, Basti Circle, Basti, Uttar Pradesh Basti, Uttar Pradesh 42.8 25.2
Long Term Output and Performance Based Road maintenance work for the roads under Road Division, Dehri on – Sone (Package no. 58/OPRMC/[Dehri]” Executive Engineer, RCD, Road Division, Dehri – On - Sone, Bihar Dehri On Sone, Bihar 28 58.9
Construction / Improvement cum Output and Performance Based Road Assets maintenance work for the road Akbarpur – Yadunathpur from Km. 0 to Km. 14.50 under Road Division , Dehri – On - Sone Executive Engineer, RCD, Road Division, Dehri – On - Sone, Bihar Dehri On Sone, Bihar 18.63 14.5
IRQP work in Km. 153 to 166 of NH – 80 for the year 2013-14 Executive Engineer, NH Division, RCD, Bhagalpur, Bihar Bhagalpur, Bihar 12.7 13
Short Term Improvement & Routine Maintenance of Makhanpur – Etawah Bypass Section from Km. 250.533 to Km. 323.475 of NH – 2 (Length 72.942 Km.) in the State of Uttar Pradesh GM (CM-1), National Highways Authority of India, New Delhi Shikohabad - Etawah, Uttar Pradesh 10.8 73
Construction Of Additional (2+2) Lanes And One Lane For Exempted Vehicle On Either Side (Upgrading From Existing 2+2 Lane To 4+4 Lane) At Km 416 (Barsoni)Of Nh-31 And Allied Works For Collection Of User Fee In Respect Of Purnea-Dolkhola Section From Km 410.700 To 447.000 Of Nh -31 In Bihar Project Director, PIU, NHAI, Siliguri Siliguri,West Bengal 9.92 2.5
Short Term Improvement and Routine Maintenance of Siliguri – Islampur – Dalkhola – Purnea Section of NH – 31 from Km. 410.700 to Km. 551.000 (Excluding Km. 498.780 to Km. 507.000) During 2013-14 in the State of Bihar and West Bengal Project Director, PIU, National Highways Authority of India, Siliguri, Wet Bengal Siliguri,West Bengal 4.88 132
Maintenance of Mau - Gorakhpur Section of NH-29 (from Km:110 to Km. 158 ) - Stretch Identified for improvement under NHDP Phase - IV A i.e. Km 118 to 121, 123 to 125 127, 130 to 132, 138 to 142, 144, 145, 149 (total length 17.300 km) with patch work in selected locations in Mau district, State U.P National Highways Authority of India Gorakhpur, Uttar Pradesh 12.4 17.3
Maintenance of Mau - Gorakhpur Section of NH-29 (from Km:159 to Km. 208.5 ) - Stretch Identified for improvement under NHDP Phase - IV A i.e. Km 159, 172, 186, 187, 190, 191, 192, 200, 201, 203 to 208.500 (total length 14.800 km) with patch work in selected locations in Mau district, State U.P National Highways Authority of India Gorakhpur, Uttar Pradesh 9.96 14.8
Short Term Improvement and Routine Maintenance of Lucknow – Muzaffarpur National Highway Project – 4-laning from Km 279.800 to Km 360.915 of Gorakhpur - UP/ Bihar border section of NH-28 in the State of UP, for Construction Package LMNHP-EW-II (WB)–7 & 8 National Highways Authority of India Kushinagar, Uttar Pradesh 4.49 81
Upgrading the infrastructure at Toll Plaza Gurau (Formerly Semra Atikabad) located at Km. 285.00 of NH-2 for implementation of ETC on PAN India basis National Highways Authority of India Firozabad, Uttar pradesh 4.75 0.5
Short term improvement and Routine Maintenance of Purnea – Dalkhola Section of NH 31 from Km. 410.700 to Km. 447.00 in the State of Bihar National Highways Authority of India Purnia Bihar 1.88 36
Construction / Improvement cum Output & Performance Based Road Assets Maintenance work in S.H.-100 (Barari Bridge) to S.H. 71 (Rohinia) via KelaBigha, Telhara, Soniawan & Kovil for the year 2014-15 under R.C.D., Road Division, Hilsa Executive Engineer, RCD, Road Division, Hilsa (Nalanda), Bihar Gaya, Bihar 20 12
Short term improvement and Routine Maintenance of Purnea – Dalkhola Section of NH 31 from Km. 410.700 to Km. 447.00 in the State of Bihar National Highways Authority of India Purnea, Bihar 1.90 36.3
Development of Umar - Phoop Pratappur road on BOT (Toll + Annuaity) basis General Manager, MPRDC, Bhopal Bhind, Madhya Pradesh 89 43
Widening & Improvement in Pachrukhia Feshar -Aurangabad Road from Km. 0.00 to 35.00 Executive Engineer, RCD, Road Division no. 1, Aurangabad Aurangabad, Bihar 29.33 35
RESTORATIVE REPAIRS OF FOURTH OIL BERTH (FOB) AT JAWAHAR DWEEP Director, Mumbai Por Trust,Mumbai Mumbai, Maharashtra 28.19 4.5
Rehabilitation and Upgrading to 2 lane / 2 lane with paved shoulders configuration and Strengthening of Anisabad - Aurangabad - Hariharganj section (Km. 0.00 to 154.625) of NH 98 in the State of Bihar (package No. NHIIP-BR-98-1) (Lt 1- Km. 0.00 to 62.00) under Phase 1of national highways interconnectivity improvement projects(NHIIP) Superintending Engineer, EAP-II, Mort&h, New Delhi Aurangabad, Bihar 282  
Widening & Strengthening existing Single / intermediate lane to 2 lane from Km. 30.35 to 54.40 of NH-81 in Bihar under Special project Zone (Job No. 081-BHR-2010-11-036) Chief Engineer, NH Wing, RCD, Bihar, Patna Katihar, Bihar    

Leave us a message

Corporate Office

907, New Delhi House
Barakhamba Road
Connaught Place
Delhi - 110001
India

Email: info@spinfra.in

Telephone: +91 11 2375 3726

Fax: +91 11 4585 0311

Our Presence

Corporate Headquarters
907, New Delhi House
Barakhamba Road
Connaught Place
New Delhi-110001
....................................

Site Office
Kullu
Himachal Pradesh
....................................

Site Office
Roing
Arunanchal Pradesh
....................................

Project Office
Lucknow
Uttar Pradesh
....................................

Project Office
Patna
Bihar
....................................

Project Office
Ranchi
Jharkhand
....................................

Register of Wages

  • OCT 2014
  • NOV 2014
  • DEC 2014
  • JAN(1) 2015
  • JAN(2) 2015
  • FEB 2015
  • March 2015
  • April 2015
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD
907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001
Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - OCTOBER 2014
Sl. No. Name of Workman Desination/
nature of work done
Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Adv Net amount paid Payment By Cheque
Basic Wages HRA Other Allowance GWR Total Wages EPF 12% ESI 1.75%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 19
1 Nanhelal S/o Ram Charan U.S.W. 31 30 18 10126 6500 2600 1026 6290 2516 993 5880 15679 755 274 1029 816 13834 280593
2 Surender S/o Padherat Seth U.S.W. 31 19 9.5 10126 6500 2600 1026 3984 1594 629 3103 9309 478 155 633 492 8184 280594
3 Arvind S/o Shishpal U.S.W. 31 16 8 10126 6500 2600 1026 3355 1342 530 2613 7839 403 130 533 415 6892 280595
4 Naushad S/o Shamsher U.S.W. 31 27 14.875 10126 6500 2600 1026 5661 2265 894 4859 13678 679 239 919 712 12048 280596
5 Jitender S/o Raghbar Dayal U.S.W. 31 21 13.5 10126 6500 2600 1026 4403 1761 695 4410 11269 528 187 715 597 9957 280597
6 Lala Ram S/o Dhori Lal U.S.W. 31 26 20.5 10126 6500 2600 1026 5452 2181 861 6696 15189 654 252 906 804 13479 280598
7 Rajiv Kumar S/o Sarwan Kumar U.S.W. 31 4 5 10126 6500 2600 1026 839 335 132 1633 2940 101 49 150 155 2635 280599
8 Sunil Kumar Verma S/o Harender U.S.W. 31 14 7 10126 6500 2600 1026 2935 1174 463 2287 6860 352 120 472 356 6031 280600
9 Vipin KumarS/o Sukh Nandan U.S.W. 31 28 14 10126 6500 2600 1026 5871 2348 927 4573 13719 705 228 933 727 12060 280601
10 Nand Kishore S/o Sunder Lal U.S.W. 31 5 1 10126 6500 2600 1026 1048 419 165 327 1960 126 33 159 104 1697 280602
11 Shahbjad S/o Dost Mohd U.S.W. 31 29 23.5 10126 6500 2600 1026 6081 2432 960 7676 17149 730 285 1015 908 15226 280603
12 Amit S/O Harees U.S.W. 31 9 4.5 10126 6500 2600 1026 1887 755 298 1470 4410 226 74 300 233 3876 280604
13 Hari Shanker Tiwari S/o Kamla Prasad Tiwari USW 31 12 6 10126 6500 2600 1026 2516 1006 397 1960 5880 302 98 400 312 5168 280605
14 Ram Shajiwan S/o Shreepal USW 31 12 8.5 10126 6500 2600 1026 2516 1006 397 2776 6696 302 111 413 354 5929 280606
15 Rasid S/o Jameel Ahmed USW 31 21 10.5 10126 6500 2600 1026 4403 1761 695 3430 10289 528 171 699 545 9045 280607
16 Sahil S/o Raj Kumar USW 31 12 9 10126 6500 2600 1026 2516 1006 397 2940 6860 302 114 416 363 6081 280608
17 Angad Kumar S/o Ram Saran USW 31 10 6 10126 6500 2600 1026 2097 839 331 1960 5226 252 87 339 277 4611 280609
18 Suneel S/o Ombeer USW 31 14 12 10126 6500 2600 1026 2935 1174 463 3920 8493 352 141 493 450 7550 280610
19 Darmender S/o Rakesh Singh USW 31 24 12 10126 6500 2600 1026 5032 2013 794 3920 11759 604 195 799 622 10338 280611
20 Lav Kush S/o Chandra Sekhar USW 31 17 10 10126 6500 2600 1026 3565 1426 563 3266 8819 428 147 575 467 7778 280612
21 Vinod S/o Khushee Ram USW 31 27 22.5 10126 6500 2600 1026 5661 2265 894 7350 16169 679 268 947 856 14366 280613
22 Ajay Kumar S/o Mukesh Chanda USW 31 19 15.5 10126 6500 2600 1026 3984 1594 629 5063 11269 478 187 665 596 10008 280614
23 Karan S/o Suraj Singh USW 31 18 12 10126 6500 2600 1026 3774 1510 596 3920 9799 453 163 616 518 8665 280615
24 Vinod S/o Tikka Ram USW 31 24 12 10126 6500 2600 1026 5032 2013 794 3920 11759 604 195 799 622 10338 280616
25 Mukesh Sharma S/o Ramesh Sharma USW 31 9 4.5 10126 6500 2600 1026 1887 755 298 1470 4410 226 74 300 233 3876 280617
26 Mata Badal W/o Jagdish USW 31 10 9 10126 6500 2600 1026 2097 839 331 2940 6206 252 103 355 329 5523 280618
27 Ajeet Xalxo W/o Manvel Xalxo USW 31 15 6 10126 6500 2600 1026 3145 1258 496 1960 6860 377 114 491 363 6005 280619
28 Suresh Chanda S/o Munshee Lal USW 31 12 6 10126 6500 2600 1026 2516 1006 397 1960 5880 302 98 400 312 5168 280620
29 Vijay Kumar S/o Jairaj Singh USW 31 11 5.5 10126 6500 2600 1026 2306 923 364 1797 5390 277 90 367 285 4738 280621
30 Hera Lal S/o Kishan Prasad USW 31 10 6 10126 6500 2600 1026 2097 839 331 1960 5226 252 87 339 277 4611 280622
31 Jeetu S/o Bhagerath Singh USW 31 10 6.5 10126 6500 2600 1026 2097 839 331 2123 5390 252 90 342 285 4763 280623
515 318.88 107983.87 17044.8 104159 272381 12958 4767 17518 240478 8698848
12938
PF 13.61% 14697 ESI@4.75% 12254 17705
17705
107984
12958 3963 16921
8995 4.75 12938
1188
540 1.75 4766.7
11
8.1 27655 17705
1.9
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD
 907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001
Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period :- NOVEMBER 2014
Sl. No.  Name of Workman Desination/
nature of work done
Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
Basic Wages Other Allowance HRA GWR Total Wages EPF 12%   ESI 1.75%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Nanhelal
S/o Ram Charan
U.S.W. 30 23 11.5 10126 6500 2600 1026 4983 787 1993 3882 11645 598 204 802 10843 280627
2 Surender
S/o Padherat Seth
U.S.W. 30 19 9.5 10126 6500 2600 1026 4117 650 1647 3207 9620 494 169 663 8957 280628
3 Arvind
S/o Shishpal
U.S.W. 30 21 10.5 10126 6500 2600 1026 4550 718 1820 3544 10632 546 187 733 9899 280629
4 Naushad
S/o Shamsher
U.S.W. 30 25 12.5 10126 6500 2600 1026 5417 855 2167 4219 12658 650 222 872 11786 280630
5 Bapa Ghose
S/o Nepal Ghose
U.S.W. 30 21 10.5 10126 6500 2600 1026 4550 718 1820 3544 10632 546 187 733 9899 280631
6 Jitender
S/o Raghbar Dayal
U.S.W. 30 17 8.5 10126 6500 2600 1026 3683 581 1473 2869 8607 442 151 593 8014 280632
7 Lala Ram
S/o Dhori Lal
U.S.W. 30 18 13.5 10126 6500 2600 1026 3900 616 1560 4557 10632 468 187 655 9977 280633
8 Sunil Kumar Verma
S/o Harender
U.S.W. 30 2 1 10126 6500 2600 1026 433 68 173 338 1013 52 18 70 943 280634
9 Vipin Kumar
S/o Sukh Nandan
U.S.W. 30 25 12.5 10126 6500 2600 1026 5417 855 2167 4219 12658 650 222 872 11786 280635
10 Shahbjad
S/o Dost Mohd
U.S.W. 30 28 20 10126 6500 2600 1026 6067 958 2427 6751 16202 728 284 1012 15190 280636
11 Amit
S/O Harees
U.S.W. 30 24 12 10126 6500 2600 1026 5200 821 2080 4050 12151 624 213 837 11314 280637
12 Hari Shanker Tiwari
S/o Kamla Prasad Tiwari
USW 30 28 14 10126 6500 2600 1026 6067 958 2427 4725 14176 728 249 977 13199 280638
13 Ram Shajiwan
S/o Shreepal
USW 30 17 10 10126 6500 2600 1026 3683 581 1473 3375 9113 442 160 602 8511 280639
14 Rasid
S/o Jameel Ahmed
USW 30 12 6 10126 6500 2600 1026 2600 410 1040 2025 6076 312 107 419 5657 280640
15 Angad Kumar
S/o Ram Saran
USW 30 30 15 10126 6500 2600 1026 6500 1026 2600 5063 15189 780 266 1046 14143 280641
16 Suneel
S/o Ombeer
USW 30 27 18 10126 6500 2600 1026 5850 923 2340 6076 15189 702 266 968 14221 280642
17 Darmender
S/o Rakesh ingh
USW 30 20 10 10126 6500 2600 1026 4333 684 1733 3375 10126 520 178 698 9428 280643
18 Vinod
S/o Khushee Ram
USW 30 28 17 10126 6500 2600 1026 6067 958 2427 5738 15189 728 266 994 14195 280644
19 Vinod
S/o Tikka Ram
USW 30 17 8.5 10126 6500 2600 1026 3683 581 1473 2869 8607 442 151 593 8014 280645
20 Suresh Chanda
S/o Munshee Lal
USW 30 24 12 10126 6500 2600 1026 5200 821 2080 4050 12151 624 213 837 11314 280646
21 Vijay Kumar
S/o Jairaj Singh
USW 30 17 8.5 10126 6500 2600 1026 3683 581 1473 2869 8607 442 151 593 8014 280647
22 Jeetu
S/o Bhagerath Singh
USW 30 18 9 10126 6500 2600 1026 3900 616 1560 3038 9113 468 160 628 8485 280648
23 Md.Safique
S/o Aziz
USW 30 29 14.5 10126 6500 2600 1026 6283 992 2513 4894 14683 754 257 1011 13672 280649
24 Shyam Narayan
S/o Chander Bhan
USW 30 21 12 10126 6500 2600 1026 4550 718 1820 4050 11139 546 195 741 10398 280650
25 Chandan Kumar
S/o Jagdish Mahto
USW 30 5 2.5 10126 6500 2600 1026 1083 171 433 844 2532 130 45 175 2357 280651
26 Kamaruddin
S/o Kamar Shah
USW 30 10 5 10126 6500 2600 1026 2167 342 867 1688 5063 260 89 349 4714 280652
        526 284         ##### 17989 45587 95859 273402 13676 4797 18473 254929 7296627
12987
PF ###### 15510 ESI@4.75% 12987 17784
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD
907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001
Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - DECEMBER 2014
Sl. No. Name of Workman Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
Basic Wages HRA Other Allowance GWR Total Wages EPF 12% ESI 1.75%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 Nanhelal
S/o Ram Charan
U.S.W. 31 31 15.5 10126 6500 2600 1026 6500 2600 1026 5063 15189 780 266 1046 14143 846711
2 Surender
S/o Padherat Seth
U.S.W. 31 21 10.5 10126 6500 2600 1026 4403 1761 695 3430 10289 528 181 709 9580 846712
3 Arvind
S/o Shishpal
U.S.W. 31 21 10.5 10126 6500 2600 1026 4403 1761 695 3430 10289 528 181 709 9580 846713
4 Naushad
S/o Shamsher
U.S.W. 31 29 16 10126 6500 2600 1026 6081 2432 960 5226 14699 730 258 988 13711 846714
5 Bapa Ghose
S/o Nepal Ghose
U.S.W. 31 25 12.5 10126 6500 2600 1026 5242 2097 827 4083 12249 629 215 844 11405 846715
6 Jitender
S/o Raghbar Dayal
U.S.W. 31 25 12.5 10126 6500 2600 1026 5242 2097 827 4083 12249 629 215 844 11405 846717
7 Sunil Kumar Verma
S/o Harender
U.S.W. 31 18 10 10126 6500 2600 1026 3774 1510 596 3266 9146 453 161 614 8532 846718
8 Vipin Kumar
S/o Sukh Nandan
U.S.W. 31 28 14 10126 6500 2600 1026 5871 2348 927 4573 13719 705 241 946 12773 846719
9 Shahbjad
S/o Dost Mohd
U.S.W. 31 28 18.5 10126 6500 2600 1026 5871 2348 927 6043 15189 705 266 971 14218 846720
10 Amit S/O Harees U.S.W. 31 15 8 10126 6500 2600 1026 3145 1258 496 2613 7513 377 132 509 7004 846721
11 Hari Shanker Tiwari S/o Kamla Prasad Tiwari USW 31 16 8 10126 6500 2600 1026 3355 1342 530 2613 7839 403 138 541 7298 846722
12 Ram Shajiwan
S/o Shreepal
USW 31 22 11 10126 6500 2600 1026 4613 1845 728 3593 10779 554 189 743 10036 846723
13 Rasid
S/o Jameel Ahmed
USW 31 3 1.5 10126 6500 2600 1026 629 252 99 490 1470 75 26 101 1369 846724
14 Angad Kumar
S/o Ram Saran
USW 31 20 10 10126 6500 2600 1026 4194 1677 662 3266 9799 503 172 675 9124 846725
15 Suneel
S/o Ombeer
USW 31 31 21.5 10126 6500 2600 1026 6500 2600 1026 7023 17149 780 301 1081 16068 846726
16 Darmender
S/o Rakesh Singh
USW 31 6 3 10126 6500 2600 1026 1258 503 199 980 2940 151 52 203 2737 846727
17 Vinod
S/o Khushee Ram
USW 31 30 18 10126 6500 2600 1026 6290 2516 993 5880 15679 755 275 1030 14649 846728
18 Vinod
S/o Tikka Ram
USW 31 8 4 10126 6500 2600 1026 1677 671 265 1307 3920 201 69 270 3650 846729
19 Suresh Chand
S/o Munshee Lal
USW 31 20 10 10126 6500 2600 1026 4194 1677 662 3266 9799 503 172 675 9124 846730
20 Jeetu
S/o Bhagerath Singh
USW 31 23 11.5 10126 6500 2600 1026 4823 1929 761 3756 11269 579 198 777 10492 846731
21 Md. Safique
S/o Aziz
USW 31 30 15 10126 6500 2600 1026 6290 2516 993 4900 14699 755 258 1013 13686 846732
22 Shyam Narayan
S/o Chander Bhan
USW 31 2 1 10126 6500 2600 1026 419 168 66 327 980 50 18 68 912 846733
23 Kamaruddin
S/o Kamar Shah
USW 31 29 14.5 10126 6500 2600 1026 6081 2432 960 4736 14209 730 249 979 13230 846734
24 Haroon Raseed
S/o Quddusr
USW 31 25 12.5 10126 6500 2600 1026 5242 2097 827 4083 12249 629 215 844 11405 846735
25 Dinesh Mandal
S/o Murli Mandal
USW 31 4 2 10126 6500 2600 1026 839 335 132 653 1960 101 35 136 1824 846736
26 Rajiv
S/oPhool Singh
USW 31 14 7 10126 6500 2600 1026 2935 1174 463 2287 6860 352 121 473 6387 846737
27 Abdul Mobin
S/o Abdul Haseeb
USW 31 14 7 10126 6500 2600 1026 2935 1174 463 2287 6860 353 121 474 6386 846738
28 Atul Mandal
S/o Dashu Mandal
USW 31 8 5.5 10126 6500 2600 1026 1677 671 265 1797 4410 201 78 279 4131 846739
546 291 ##### 45794 18071 95054 ##### 13739 4803 18542 #####
PF ###### 15582 ESI@4.75 12987 17790
114484
13739 4640 18379
9099
1259
546
11
8.1 29294
1.9
Register of Wages
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD                                                                         907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001 Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - January 2015
Sl. No.  Token No. 4.75% Name of Workman       Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
  Basic Wages HRA Other Allowance GWR Total Wages EPF         12%   ESI 1.75%
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1   Nanhelal                                        S/o Ram Charan U.S.W. 31 30 15 10126 6500 2600 1026 6290 2516 993 4900 14699 755 258 1013 13686 290155
2   Surender                                      S/o Padherat Seth U.S.W. 31 23 14.5 10126 6500 2600 1026 4823 1929 761 4736 12249 579 215 794 11455 290156
3   Arvind                                              S/o Shishpal U.S.W. 31 17 8.5 10126 6500 2600 1026 3565 1426 563 2776 8329 428 146 574 7755 290157
4   Naushad                                                     S/o Shamsher U.S.W. 31 29 16 10126 6500 2600 1026 6081 2432 960 5226 14699 730 258 988 13711 290158
5   Bapa Ghose                                S/o Nepal Ghose U.S.W. 31 27 16.5 10126 6500 2600 1026 5661 2265 894 5390 14209 679 249 928 13281 290159
6   Jitender                                                       S/o Raghbar Dayal U.S.W. 31 26 17.5 10126 6500 2600 1026 5452 2181 861 5716 14209 654 249 903 13306 290160
7   Sunil Kumar Verma           S/o Harender U.S.W. 31 23 11.5 10126 6500 2600 1026 4823 1929 761 3756 11269 579 198 777 10492 290161
8   Vipin Kumar                                                                   S/o Sukh Nandan U.S.W. 31 26 13 10126 6500 2600 1026 5452 2181 861 4246 12739 654 223 877 11862 290162
9   Shahbjad                                                                  S/o Dost Mohd U.S.W. 31 29 17.5 10126 6500 2600 1026 6081 2432 960 5716 15189 730 266 996 14193 290163
10   Vinod                                           S/o Khushee Ram USW 31 18 12 10126 6500 2600 1026 3774 1510 596 3920 9799 453 172 625 9174 290164
11   Suresh Chand                                            S/o Munshee Lal USW 31 9 6 10126 6500 2600 1026 1887 755 298 1960 4900 226 86 312 4588 290165
12   Jeetu                                           S/o  Bhagerath Singh USW 31 19 12.5 10126 6500 2600 1026 3984 1594 629 4083 10289 478 181 659 9630 290166
13   Md. Safique                S/o Aziz USW 31 26 13 10126 6500 2600 1026 5452 2181 861 4246 12739 654 223 877 11862 290167
14   Kamaruddin               S/o Kamar Shah USW 31 25 12.5 10126 6500 2600 1026 5242 2097 827 4083 12249 629 215 844 11405 290168
15   Haroon Raseed     S/o Quddusr USW 31 28 15.5 10126 6500 2600 1026 5871 2348 927 5063 14209 705 249 954 13255 290169
16   Rajiv                          S/oPhool Singh USW 31 30 16.5 10126 6500 2600 1026 6290 2516 993 5390 15189 755 266 1021 14168 290170
17   Abdul Mobin               S/o Abdul Haseeb USW 31 25 15.5 10126 6500 2600 1026 5242 2097 827 5063 13229 629 232 861 12368 290171
18   Atul Mandal                         S/o Dashu Mandal      USW 31 29 23.5 10126 6500 2600 1026 6081 2432 960 7676 17149 730 301 1031 16118 290172
19   Suresh Shah              S/o Sukhari Shah USW 31 19 9.5 10126 6500 2600 1026 3984 1594 629 3103 9309 478 163 641 8668 290173
20   Mohd. Haider Ali    S/o Mohd. Ashfaque USW 31 6 4.5 10126 6500 2600 1026 1258 503 199 1470 3430 151 61 212 3218 290174
21   Mohd. Asif                S/o Abdul Raseed USW 31 14 8.5 10126 6500 2600 1026 2935 1174 463 2776 7350 352 129 481 6869 290175
22   Shakil                    S/o Esrofil USW 31 15 7.5 10126 6500 2600 1026 3145 1258 496 2450 7350 377 129 506 6844 290176
23   Sahid                                 S/o Anwar USW 31 18 10.5 10126 6500 2600 1026 3774 1510 596 3430 9309 453 163 616 8693 290177
24   Ram Ratan    S/o Banslal USW 31 19 9.5 10126 6500 2600 1026 3984 1594 629 3103 9309 478 163 641 8668 290178
          530 307         111129 44452 17541 100280 273402 13335 4795 18131 255271 6963996
Register of Wages
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD                                                                         907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001 Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - January 2015
Sl. No.  Token No. 4.75% Name of Workman       Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
Basic Wages Other Allowance GWR Total Wages EPF         12%   ESI 1.75%
1 2 3 7 8 9 10 11 12 14 15 17 18 19 20 21 22 23
1   Muzammil          S/o Mohd. Haque U.S.W. 31 17 0 10126 6500 3626 3565 1988 0 5553 428 98 526 5027 290151
2   Rahbar                                      S/o Nizamuddin U.S.W. 31 17 0 10126 6500 3626 3565 1988 0 5553 428 98 526 5027 290152
3   Zafar                                             S/o Zakarool U.S.W. 31 17 0 10126 6500 3626 3565 1988 0 5553 428 98 526 5027 290153
4   Nizamuddin                                                     S/o Habeebur Rahaman U.S.W. 31 17 0 10126 6500 3626 3565 1988 0 5553 428 98 526 5027 290154
          68 0       14258 7954 0 22212 1712 392 2104 20108 1160610
  1056  
PF 13.61% 1160610 ESI@4.75% 1056 1448
14258
1712 524 2236
1188
157
71
2
3654
Register of Wages
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD                                                                         907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001 Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - February 2015
Sl. No.  Token No. 4.75% Name of Workman       Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
  Basic Wages HRA Other Allowance GWR Total Wages EPF         12%   ESI 1.75%
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1   Nanhelal                                        S/o Ram Charan U.S.W. 28 27 13.5 10126 6500 2600 1026 6268 2507 989 4882 14647 752 257 1009 13638 290151
2   Surender                                      S/o Padherat Seth U.S.W. 28 20 11.5 10126 6500 2600 1026 4643 1857 733 4159 11392 557 200 757 10635 290152
3   Arvind                                              S/o Shishpal U.S.W. 28 28 14 10126 6500 2600 1026 6500 2600 1026 5063 15189 780 266 1046 14143 290153
4   Naushad                                                     S/o Shamsher U.S.W. 28 25 15.5 10126 6500 2600 1026 5804 2321 916 5605 14647 696 257 953 13694 290154
5   Bapa Ghose                                S/o Nepal Ghose U.S.W. 28 15 7.5 10126 6500 2600 1026 3482 1393 550 2712 8137 418 143 561 7576 290155
6   Jitender                                                       S/o Raghbar Dayal U.S.W. 28 24 16 10126 6500 2600 1026 5571 2229 879 5786 14466 669 254 923 13543 290156
7   Sunil Kumar Verma           S/o Harender U.S.W. 28 16 8 10126 6500 2600 1026 3714 1486 586 2893 8679 446 152 598 8081 290157
8   Vipin Kumar                                                                   S/o Sukh Nandan U.S.W. 28 24 12 10126 6500 2600 1026 5571 2229 879 4340 13019 669 228 897 12122 290158
9   Shahbjad                                                                  S/o Dost Mohd U.S.W. 28 27 15 10126 6500 2600 1026 6268 2507 989 5425 15189 752 266 1018 14171 290159
10   Suneel                                             S/o Ombeer USW 28 28 18.5 10126 6500 2600 1026 6500 2600 1026 6690 16816 780 295 1075 15741 290160
11   Vinod                                           S/o Khushee Ram USW 28 24 13.5 10126 6500 2600 1026 5571 2229 879 4882 13562 669 238 907 12655 290161
12   Jeetu                                           S/o  Bhagerath Singh USW 28 20 10 10126 6500 2600 1026 4643 1857 733 3616 10849 557 190 747 10102 290162
13   Kamaruddin               S/o Kamar Shah USW 28 22 11 10126 6500 2600 1026 5107 2043 806 3978 11934 613 209 822 11112 290163
14   Haroon Raseed     S/o Quddusr USW 28 25 12.5 10126 6500 2600 1026 5804 2321 916 4521 13562 696 238 934 12628 290164
15   Rajiv                          S/oPhool Singh USW 28 27 15 10126 6500 2600 1026 6268 2507 989 5425 15189 752 266 1018 14171 290165
16   Abdul Mobin               S/o Abdul Haseeb USW 28 24 13.5 10126 6500 2600 1026 5571 2229 879 4882 13562 669 238 907 12655 290166
17   Atul Mandal                         S/o Dashu Mandal      USW 28 19 13 10126 6500 2600 1026 4411 1764 696 4701 11573 529 203 732 10841 290167
18   Suresh Shah              S/o Sukhari Shah USW 28 22 11.5 10126 6500 2600 1026 5107 2043 806 4159 12115 613 213 826 11289 290168
19   Shakil                    S/o Esrofil USW 28 2 1 10126 6500 2600 1026 464 186 73 362 1085 56 19 75 1010 290169
20   Sahid                                 S/o Anwar USW 28 26 16 10126 6500 2600 1026 6036 2414 953 5786 15189 724 266 990 14199 290170
21   Ram Ratan    S/o Banslal USW 28 24 18 10126 6500 2600 1026 5571 2229 879 6510 15189 669 266 935 14254 290171
22   Ashoke Bengali S/o Pancha Nand USW 28 4 2 10126 6500 2600 1026 929 371 147 723 2170 111 38 149 2021 290172
23   Suneel Shahni  S/o Mushafir USW 28 3 1.5 10126 6500 2600 1026 696 279 110 542 1627 84 29 113 1514 290173
24   Anand Ghose  S/oShashankdhar USW 28 6 3 10126 6500 2600 1026 1393 557 220 1085 3255 167 57 224 3031 290174
          482 273         111893 44757 17662 98729 273040 13428 4788 18216 254824  
Register of Wages
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD                                                                         907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001 Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : - MARCH 2015
Sl. No.  Token No. 4.75% Name of Workman       Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
  Basic Wages HRA Other Allowance GWR Total Wages EPF         12%   ESI 1.75%
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1   Nanhelal                                        S/o Ram Charan U.S.W. 31 25 14 10126 6500 2600 1026 5242 2097 827 4573 12739 629 223 852 11887 337595
2   Surender                                      S/o Padherat Seth U.S.W. 31 22 15.5 10126 6500 2600 1026 4613 1845 728 5063 12249 554 215 769 11480 337596
3   Arvind                                              S/o Shishpal U.S.W. 31 27 19.5 10126 6500 2600 1026 5661 2265 894 6370 15189 679 266 945 14244 337597
4   Naushad                                                     S/o Shamsher U.S.W. 31 28 17 10126 6500 2600 1026 5871 2348 927 5553 14699 705 258 963 13736 337598
5   Jitender                                                       S/o Raghbar Dayal U.S.W. 31 27 19.5 10126 6500 2600 1026 5661 2265 894 6370 15189 679 266 945 14244 337599
6   Sunil Kumar Verma           S/o Harender U.S.W. 31 31 21.5 10126 6500 2600 1026 6500 2600 1026 7023 17149 780 301 1081 16068 337600
7   Vipin Kumar                                                                   S/o Sukh Nandan U.S.W. 31 31 18.5 10126 6500 2600 1026 6500 2600 1026 6043 16169 780 283 1063 15106 337601
8   Shahbjad                                                                  S/o Dost Mohd U.S.W. 31 31 15.5 10126 6500 2600 1026 6500 2600 1026 5063 15189 780 266 1046 14143 337602
9   Suneel                                             S/o Ombeer USW 31 26 20 10126 6500 2600 1026 5452 2181 861 6533 15026 654 263 917 14109 337603
10   Vinod                                           S/o Khushee Ram USW 31 24 15 10126 6500 2600 1026 5032 2013 794 4900 12739 604 223 827 11912 337604
11   Jeetu                                           S/o  Bhagerath Singh USW 31 11 7 10126 6500 2600 1026 2306 923 364 2287 5880 277 103 380 5500 337584
12   Kamaruddin               S/o Kamar Shah USW 31 1 0.5 10126 6500 2600 1026 210 84 33 163 490 25 9 34 456 337585
13   Haroon Raseed     S/o Quddusr USW 31 31 15.5 10126 6500 2600 1026 6500 2600 1026 5063 15189 780 266 1046 14143 337586
14   Rajiv                          S/oPhool Singh USW 31 4 2 10126 6500 2600 1026 839 335 132 653 1960 101 35 136 1824 337587
15   Abdul Mobin               S/o Abdul Haseeb USW 31 24 15 10126 6500 2600 1026 5032 2013 794 4900 12739 604 223 827 11912 337588
16   Atul Mandal                         S/o Dashu Mandal      USW 31 31 15.5 10126 6500 2600 1026 6500 2600 1026 5063 15189 780 266 1046 14143 337589
17   Shakil                    S/o Esrofil USW 31 4 2 10126 6500 2600 1026 839 335 132 653 1960 101 35 136 1824 337590
18   Sahid                                 S/o Anwar USW 31 30 24 10126 6500 2600 1026 6290 2516 993 7839 17639 755 309 1064 16575 337591
19   Ram Ratan    S/o Banslal USW 31 23 16 10126 6500 2600 1026 4823 1929 761 5226 12739 579 223 802 11937 337592
20   Ashoke Bengali S/o Pancha Nand USW 31 19 12.5 10126 6500 2600 1026 3984 1594 629 4083 10289 478 181 659 9630 337593
21   Ram Sajeevan                 S/o Shreepal USW 31 17 11.5 10126 6500 2600 1026 3565 1426 563 3756 9309 428 163 591 8718 337594
22   Rajesh USW 31 20 10 10126 6500 2600 1026 4194 1677 662 3266 9799 503 172 675 9124 337595
23   Vikash Kumar USW 31 21 10.5 10126 6500 2600 1026 4403 1761 695 3430 10289 528 181 709 9580 337596
24   Mansa Ram USW 31 7 4 10126 6500 2600 1026 1468 587 232 1307 3593 176 63 239 3354 337597
          515 322         107984 43194 17045 105180 273403 12959 4793 17752 255650 14699
Register of Wages
Name and Address of Contractor : - S&P INFRASTRUCTURE DEVELOPERS (P) LTD                                                                         907 New Delhi House, 27 Barakhamba Road, New Delhi- 110001 Name and Address of Establishment in/under with contract is carried on : - M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, New Delhi-25 
Nature and Location of work :- Transportation of Processing Rejects & Ash Disposal at Okhla, New Delhi. Name and Address of Principal Employer : -M/s Timarpur Okhla Waste Management Company Pvt. Ltd., Mathura Road, N. Delhi-110025
Wage Period : -APRIL 2015
Sl. No.  Token No. 4.75% Name of Workman       Desination/nature of work done Month Days No. of Days Worked GWR Days Rate of wages Basic Wages HRA Other Allowance Amount of wages earned Deductions, if any Total Deduction Net amount paid Paid By Cheque
  Basic Wages HRA Other Allowance GWR Total Wages EPF         12%   ESI 1.75%
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1   Nanhelal                                        S/o Ram Charan U.S.W. 30 30 15 10614 6500 2600 1514 6500 2600 1514 5307 15921 780 279 1059 14862 3876605
2   Surender                                      S/o Padherat Seth U.S.W. 30 30 15 10614 6500 2600 1514 6500 2600 1514 5307 15921 780 279 1059 14862 3876606
3   Arvind                                              S/o Shishpal U.S.W. 30 26 20.5 10614 6500 2600 1514 5633 2253 1312 7253 16452 676 288 964 15488 3876607
4   Naushad                                                     S/o Shamsher U.S.W. 30 27 15 10614 6500 2600 1514 5850 2340 1363 5307 14860 702 261 963 13897 3876608
5   Jitender S/o Raghbar Dayal U.S.W. 30 26 19 10614 6500 2600 1514 5633 2253 1312 6722 15921 676 279 955 14966 3876609
6   Sunil Kumar Verma           S/o Harender U.S.W. 30 30 15.5 10614 6500 2600 1514 6500 2600 1514 5484 16098 780 282 1062 15036 3876610
7   Vipin Kumar                                                                   S/o Sukh Nandan U.S.W. 30 30 15.5 10614 6500 2600 1514 6500 2600 1514 5484 16098 780 282 1062 15036 3876611
8   Shahbjad                                                                  S/o Dost Mohd U.S.W. 30 30 15 10614 6500 2600 1514 6500 2600 1514 5307 15921 780 279 1059 14862 3876612
9   Suneel                                             S/o Ombeer USW 30 30 21 10614 6500 2600 1514 6500 2600 1514 7430 18044 780 316 1096 16948 3876613
10   Vinod                                           S/o Khushee Ram USW 30 25 20 10614 6500 2600 1514 5417 2167 1262 7076 15921 650 279 929 14992 3876614
11   Jeetu                                           S/o  Bhagerath Singh USW 30 28 15 10614 6500 2600 1514 6067 2427 1413 5307 15213 728 267 995 14218 3876615
12   Haroon Raseed     S/o Quddusr USW 30 20 10 10614 6500 2600 1514 4333 1733 1009 3538 10614 520 186 706 9908 3876616
13   Abdul Mobin               S/o Abdul Haseeb USW 30 24 15 10614 6500 2600 1514 5200 2080 1211 5307 13798 624 242 866 12932 3876617 1/4/2015
14   Atul Mandal                         S/o Dashu Mandal      USW 30 30 15 10614 6500 2600 1514 6500 2600 1514 5307 15921 780 279 1059 14862 3876618
15   Sahid                                 S/o Anwar USW 30 24 10 10614 6500 2600 1514 5200 2080 1211 3538 12029 624 211 835 11194 3876619
16   Ram Ratan    S/o Banslal USW 30 30 19.5 10614 6500 2600 1514 6500 2600 1514 6899 17513 780 307 1087 16426 3876620 1/4/2015
17   Ashoke Bengali S/o Pancha Nand USW 30 5 2.5 10614 6500 2600 1514 1083 433 252 885 2654 130 47 177 2477 3876621
18   Ram Sajeevan                 S/o  Gheesa Ram USW 30 11 5.5 10614 6500 2600 1514 2383 953 555 1946 5838 286 103 389 5449 3876622
19   Rajesh USW 30 14 10 10614 6500 2600 1514 3033 1213 707 3538 8491 364 149 513 7978 3876623
20   Vikash Kumar USW 30 11 7 10614 6500 2600 1514 2383 953 555 2477 6368 286 112 398 5970 3876624
21   Dharmendra USW 30 15 7.5 10614 6500 2600 1514 3250 1300 757 2654 7961 390 140 530 7431 3876625
22   B L Kerkata USW 30 13 6.5 10614 6500 2600 1514 2817 1127 656 2300 6899 338 121 459 6440 3876626
          509 295         110283 44113 25688 104371 284455 13234 4988 18222 266233  
13512
PF ###### 0 ESI@4.75% 13512 18500
110283
13234 4047 17281
9187
1213
551
200
28432